Office solar case studies: how to judge them

This site is an independent guide operated by SEO Dons Ltd. It is not an installer, so it has no client projects to showcase and publishes no case studies.

Case studies on solar sites are often the least reliable pages on them. If you are comparing installers for an office project, ask each one for real, checkable examples and test them against the points below.

What a genuine case study should show

  • A named client or a named, phone-able reference. "A North-West NHS Trust" or "a Birmingham accountancy firm" is not checkable.
  • The system as installed: kWp, panel count, inverter and mounting type, and whether a battery or EV chargers were included.
  • Measured generation and savings, with the period they cover, rather than a forecast presented as a result.
  • The funding route and its terms. A grant, a PPA or asset finance changes the payback completely. A "0 year payback" is a funding structure, not a result.
  • The EPC before and after, with the certificate dates, if the project was done for MEES.
  • The date the system was commissioned and the MCS or other certificates issued for it.

How to verify what you are shown

Check the installer on the MCS register, check the company on Companies House, and call the reference. The installer due-diligence checklist sets out the full list, and the accreditations to require explains how to check each body.

Where to find numbers instead

For costs, payback and finance comparisons built from stated assumptions, use the cost guide, the payback calculator and the finance routes page. They are modelled estimates, not results from real projects, and are labelled as such.