Office solar insights

Articles, guides, and analysis on solar PV for UK office buildings.

Compliance

Do solar panels improve an office EPC rating?

Do solar panels improve an office EPC rating? Yes — PV typically adds 4 to 12 EPC points. Here's how the calculation works and what it takes to reach EPC B.

Technical

Lightweight vs standard solar panels (commercial)

How lightweight solar panels compare to standard glass-glass modules on commercial roofs — weight, cost, output, and when each makes sense for offices.

Funding

Salix PSDS for office solar: what it funded and what is left

What the Salix Public Sector Decarbonisation Scheme funded for solar on public sector offices, why it was heat-led, and why Phase 4 closed in November 2024 with no new phase announced.

Economics

Are commercial solar panels worth it for offices in 2026?

A direct answer to the most common UK office solar question, with worked-out economics across five typical building profiles.

Battery storage

Battery storage for offices — when it pays back and when it doesn't

The economics of adding battery storage to an office solar installation: TRIAD avoidance, DUoS red-band shifting, capacity market revenue, and when it stops making sense.

Business case

How to write the board business case for office solar

A structured template for the board capex paper that gets office solar projects approved, with the financial framing decision-makers actually want.

Cost

How much do commercial solar panels cost in the UK in 2026?

Real installed costs per kWp for UK commercial solar in 2026, with tier breakdowns by system size and a worked office example.

Quality

Commercial solar warranties — what to look for in 2026

The four warranty layers on commercial solar installations, what they cover, and how to evaluate installer claims.

Sizing

How many solar panels does an office building need?

A simple framework for sizing solar PV on office buildings — based on actual load profile, not square-metre rules of thumb.

Compliance

MEES 2030 and office buildings — the £6 billion question

Around 21% of UK office stock sits below EPC B. What the proposed 2031 EPC B standard could mean for landlords, occupiers and a £6bn capex bill.

Economics

Why office buildings hit higher self-consumption than warehouses

Office demand profiles match PV generation almost perfectly — here's why self-consumption is the single biggest economic lever in commercial solar.

O&M

Office solar maintenance: what an O&M covers

What's included (and what isn't) in commercial solar Operations & Maintenance contracts, and how to evaluate proposals.

Project management

Office building solar — the 12-month timeline from feasibility to commissioning

A realistic 12-month timeline for a typical UK office solar project, with dependencies and the steps that drive schedule.

Planning

Planning permission for solar on commercial offices — what you actually need to know

Permitted development, prior approval at 50kWp, listed buildings, and conservation areas — the planning route for office solar in 2026.

ESG

Scope 2 emissions and office solar — what your sustainability report needs

How on-site solar reduces Scope 2 emissions under the GHG Protocol, and what reporting documentation FTSE-tenant audits expect to see.

Economics

Smart Export Guarantee tariffs for offices — what to expect in 2026

Comparison of UK Smart Export Guarantee tariffs in 2026, how to pick the right one for an office solar install, and what export revenue to expect.

Carports

Are solar carports worth it for office buildings?

Solar carport economics for UK office buildings: when canopy structure premium pays back, integration with workplace EV charging, and the design considerations.

Finance

Solar PPA vs asset finance vs cash — what works best for office buildings

Four ways to fund office solar in 2026, and how to pick between them based on lease length, balance sheet, and exit strategy.

Insurance

Solar PV insurance for office buildings — what you need to know

Insurance considerations for commercial office solar installations: building insurance impact, public liability, business interruption, and IWA.

EPC

Solar PV vs LED lighting — which delivers a bigger EPC uplift?

Head-to-head comparison of solar PV and LED relighting as EPC improvement measures for UK commercial office buildings.

PPA

What is a Solar PPA and is it right for your office building?

Solar Power Purchase Agreements explained for UK office occupiers and landlords — how they work, when they win, when they don't.

Technical

What is the 120% rule for commercial solar panels?

The 120% rule (DC-to-AC ratio) explained for UK commercial solar designers and procurers — what it means, why it matters, and the trade-offs.

Risk

Why are some businesses removing solar panels?

The reality behind solar panel removal stories — what causes it, how often it happens, and how to avoid it on a commercial install.

EV charging

Workplace EV charging and solar — why they belong together

OZEV Workplace Charging Scheme grants, daytime EV charging from solar generation, and the integrated business case for offices.

How this site works

  • Independent guide, not an installer
  • Sourced 2026 rate and grant data
  • Free enquiry: we reply by email
Enquire Email