Terms of Service

Last updated: 1 January 2026

Use of this site

This website is operated by SEO Dons Ltd. By using solarpanelsforofficebuildings.co.uk you agree to these terms. If you don't agree, please don't use the site.

Information accuracy

We make every effort to ensure information on this site is accurate, but specific commercial advice depends on your individual circumstances. The content of this site does not constitute formal advice. Get a written quote and survey before relying on any figures for a specific project.

Quotes and proposals

Any indicative price or estimate on this site is non-binding. SEO Dons is not an installer and does not issue quotes; any quote or proposal comes from the installer you choose and is non-binding until a formal contract is signed with them. Final pricing depends on site survey, structural assessment, electrical infrastructure, and DNO connection terms.

Intellectual property

The content of this site (text, images, design, code) is owned by SEO Dons Ltd or our licensors and is protected by UK copyright. You may view and print pages for personal, non-commercial use. You may not reproduce, distribute, or commercially exploit content without written permission.

Linked third-party sites

We link to third-party websites for information. We don't control those sites and aren't responsible for their content or privacy practices.

Limitation of liability

To the maximum extent permitted by law, SEO Dons Ltd excludes liability for indirect or consequential loss arising from your use of this website. Nothing in these terms excludes liability for death or personal injury caused by negligence, or for fraud.

Governing law

These terms are governed by the laws of England and Wales. Any dispute will be subject to the exclusive jurisdiction of the courts of England and Wales.

Changes to these terms

We may update these terms from time to time. The date at the top will reflect any changes.

Contact

Questions about these terms? Email hello@seodons.co.uk.

Enquire Email