How We Work

The 6-step office solar install process

From half-hourly feasibility to 25-year O&M. Predictable. Documented. MCS-certified at every stage. Typical end-to-end timeline 6-9 months from acceptance to commissioning.

Engineers reviewing solar PV installation plans
  1. 01

    Free desk feasibility

    Day 1-7

    Send half-hourly meter data + roof plan. We pull historic PVSyst irradiance for your site, model 3 sizing scenarios (conservative/optimised/ambitious), confirm planning route, and return a fully-modelled proposal within 7 working days.

    What you receive

    • PVSyst yield model
    • Three sizing scenarios
    • Capex range per scenario
    • Planning route assessment
    • Grant mapping (AIA, PSDS, WCS, SEG)
  2. 02

    On-site survey

    Week 2-4

    Our structural and electrical engineers visit. Roof condition assessed to BS EN 1991 (dead + wind loads), main switchroom checked, cable routes designed, shading verified on-site, DNO incoming capacity confirmed.

    What you receive

    • Structural calculation
    • Electrical single-line diagram
    • Cable route plan
    • Final inverter spec
    • Fixed-price proposal
  3. 03

    Permits & DNO application

    Month 2-6

    We handle planning (Permitted Development notification, Prior Approval, or full planning where required), G99 grid connection application with the local DNO, and any grant paperwork (PSDS, IETF, etc).

    What you receive

    • Planning submission
    • G99 application + DNO consultation
    • Grant application drafting
    • Building Regs Part A/L/P
    • CDM 2015 designer pack
  4. 04

    Install & commissioning

    Month 6-9

    On site for 2-10 weeks depending on system size. MCS-certified install team, NICEIC electrical certification, daily safety briefings to CDM 2015 standard. Commissioning to IEC 62446 with full performance documentation.

    What you receive

    • Mounting + panels installed
    • String + central inverters commissioned
    • Switchgear modifications complete
    • DNO witnessing visit passed
    • Customer training session
  5. 05

    Documentation & ESG handover

    Month 9

    Customer handover pack: O&M manual, electrical certificates, structural certificates, warranty documents (panels 25-yr, inverters 10-yr, workmanship 10-yr, IWA 10-yr), monitoring access. Plus Scope 2 Disclosure Pack for ESG reporting.

    What you receive

    • O&M handover manual
    • Electrical + structural certs
    • Warranty + IWA documentation
    • Scope 2 Disclosure Pack
    • SEG registration complete
  6. 06

    Ongoing O&M

    Years 1-25

    First 5 years inclusive in capex: quarterly site visits, reactive fault response within 5 working days, EICR every 5 years, annual performance report against PVSyst model. Optional extension years 6-25 at £12-18/kWp/year.

    What you receive

    • Quarterly inspection
    • Annual cleaning (where needed)
    • Reactive fault response
    • Annual performance review
    • EICR every 5 years

Accredited and certified for UK commercial work

  • MCS Certified
  • NICEIC Approved
  • RECC Member
  • TrustMark Licensed
  • IWA Insurance-Backed
  • ISO 9001 / 14001

Commercial Solar Across the UK

Our portfolio hub for commercial solar panel installation.

Smaller-scale commercial work — see solar panels for SMEs and businesses.

For Greater London-focused projects, visit London commercial solar specialists.

Specialist resource on commercial solar grants and funding.

Detailed PPA guidance at solar PPA mechanics for UK businesses.

Industrial-adjacent sector at warehouse solar installations.

For factory and industrial estate work, see manufacturing and factory solar.

Hospitality and leisure solar at solar panels for the UK hotel sector.

Heritage and faculty work at church and faculty solar specialists.